chromatic play
The commission consisted in making a multipurpose classroom for the school which needed to be internally connected with the school and at the same time have a separate entrance from the street.
The plot is elongated and one main goal of the project was to have natural lighting and cross ventilation which was achieved by having a whole translucent glass facade and skylights built in the roofing. The roofing will be used as a playground for children from the kindergarden and is connected to the school from the 2nd floor via a ramp. The materiality of the proposal is made of concrete as a frame that will allow the facade structure to be fixed to.
...
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
|||||||||||||||||||||
![]() |
![]() |
![]() |
||||||||||||||||||||
![]() |
![]() |
|||||||||||||||||||||
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
|||||||||||||||
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
||||||
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
||||||||||||||||
![]() |
![]() |
|||||||||||||||||||||
![]() |
![]() |
![]() |
![]() |